Knowledge Character Vision
Commercial Education Healthcare Cultural Utility Sustainable Contact
 
DAVID B. PERINI, JR. AWARD FOR PROJECT TEAM EFFECTIVENESS
NEW ENGLAND CONSTRUCTION USERS COUNCIL


This award winning, 680,000 SF manufacturing facility was designed, engineered, built, and occupied – “super-track” – in only 14 months. The facility was designed with 44 megawatts of power, 6.5 million CFM of air and 14,000 tons of refrigeration, producing 26°F brine and 42°F chilled water. The engineering systems were designed with an N+1 redundancy to insure a 24/7 production test environment and final QA/QC space to maintain an environment from 42°F to 72°F to 104°F.
Science and Technology Projects
Science and Technology Clients
 
Science and Technology Services