DAVID B. PERINI, JR. AWARD FOR
PROJECT TEAM EFFECTIVENESS
NEW ENGLAND CONSTRUCTION USERS COUNCIL
This award winning, 680,000 SF manufacturing facility was designed,
engineered, built, and occupied – “super-track”
– in only 14 months. The facility was designed with 44 megawatts
of power, 6.5 million CFM of air and 14,000 tons of refrigeration,
producing 26°F brine and 42°F chilled water. The engineering
systems were designed with an N+1 redundancy to insure a 24/7 production
test environment and final QA/QC space to maintain an environment
from 42°F to 72°F to 104°F. |
 |
 |